corporate_banner_en

Nîmes-Montpellier line

Projects
Regions
European Union
Enlargement countries
European Free Trade Association
Mediterranean Neighbourhood
FEMIP Overview
Maximizing synergies
Financing & advisory services
Loans
Private equity
Advisory services
FEMIP Support Package
Procurement for TA operations
How to apply
Trust Fund
Technical advisory
Private equity
MED 5P
Organisation and staff
FEMIP Internship Programme
FEMIP Secondment Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Examples of EPTATF Operations
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
Funding and Financial Instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
SMEs
Innovative options
Loans
Microfinance
EU partners for SMEs & mid-caps
Non-EU partners for SMEs & mid-caps
RDI support
Equity investment
Regional development
Climate Action
Activities
Financial instruments and advice
Climate Mainstreaming
Urban & natural environment
Agriculture and the rural economy
Innovation
Skills and Jobs
Trans-European Networks
Transport
Energy
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Process and methodology

Nîmes-Montpellier line

  •  Reference: 20090159
  •  Release date: 02 June 2009
Promoter – Financial Intermediary

Réseau Ferré de France (RFF).

Location
Description

The project consists of a 61km high-speed rail line for mixed passenger and freight traffic between the Méditerranée High-Speed Line at Manduel, southeast of Nîmes, and the Tarascon-Sète conventional network line at Lattes, southwest of Montpellier. It also includes about 10km of connections to the existing conventional network and a 10km freight link, to the east of Nîmes, with the Rhône Right Bank conventional network line at Saint Gervasy.

Objectives

The project is an essential link in France's and Europe's high-speed network and, in particular, in Priority Axis No. 3, South-West Europe's high-speed rail link (Nîmes-Barcelona-Madrid-Lisbon). The project will serve to establish passenger and freight rail services generating substantial time gains with the potential to bring about a significant modal shift from roads and hence environmental benefits. The new line will provide the basis for the development of freight transport and the improvement of the region's TER (Regional Express Train) services.

Comments
 
Sector(s)
Proposed EIB finance (Approximate amount)

Up to EUR 400 million.

Total cost (Approximate amount)

Up to EUR 1 400 million.

Environmental aspects

The Nîmes-Montpellier line was included in the French national master plan for high-speed rail links prior to the application of Directive 2001/42/EC on strategic environmental assessment (SEA). The project falls within the categories listed in Annex I of Directive 97/11/EC and was therefore subjected to an environmental impact assessment (EIA) in accordance with French administrative procedures, which take full account of Community legislation.

The EIA was conducted as part of the procedure for obtaining a declaration of public interest (DUP), which was issued on 16 May 2005. Environmental measures were defined and their implementation will be examined as part of the project appraisal, particularly with respect to the impact on the natural environment.

Procurement

RFF is bound by Community directives on procurement procedures, notably Directive 2004/17/EC. The procurement procedures will be examined as part of the project appraisal.

Status

Signed   -   28/06/2012.

Related Documents
  • 07-09-2010 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) FR

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2014
The European Investment Bank is not responsible for the content of external internet sites.

http://www.eib.org/projects/pipeline/2009/20090159.htm